We are executing a scheduled network infrastructure upgrade, migrating HTTP/HTTPS traffic through the Cloudflare proxy network. Brief disruptions may occur, but rest assured, this is a controlled operation.
π§ Affected Systems:
β
AKS Cluster β Core infrastructure enhancements.
β
HTTP/HTTPS traffic (ports 80/443) β routing through Cloudflare proxy.
β
DNS β updated to reflect new routing.
β³ Mission Timeline:
π EU Cluster: 8.7.2026, 09:00 CEST (04:00 New York) β Early recon. Stay sharp. π¦
π US Cluster: 8.7.2026, 18:00 CEST (17:00 London) β Evening operation. Be ready.
π EU2 Cluster: 15.7.2026, 18:00 CEST (17:00 London) β Evening operation. Be ready.
βΈ Expected Downtime:
Up to 30 minutes per cluster. Maintenance window: 2 hours. Operations resume no later than 2 hours after start.
π Post-Update Expectations:
Systems may experience brief instability during the transition. Functionality will be restored β with improved performance and resilience via Cloudflare's global network.
β οΈ Action required: After each cluster update, verify your DNS records are resolving correctly. If you have not yet updated your firewall rules, refer to our previous announcement.
π¨ Contingency Plan:
In case of mission failure, rollback protocols are standing by for immediate deployment.
Status reports will be issued as required. Stand by for updates.
DevOps Command Center π
Weβll find your subscription and send you a link to login to manage your preferences.
We've sent you an email β please check your inbox and click the link to continue.
Weβll use your email to save your preferences so you can update them later.
Subscribe to other services using the bell icon on the subscribe button on the status page.
Youβll no long receive any status updates from MyQ Roger, are you sure?
{{ error }}
Weβll no longer send you any status updates about MyQ Roger.
Your email has been verified β you'll now receive status updates from MyQ Roger.